Hemadhri Surveys did a detailed topographical survey of 420 km for the gas pipeline, Including Alignment, L-Section, TBM Fixing, Alignment on the ground.
We did a field survey for the proposed water pipeline, captured topographical details with geo-coordinates, located different water tanks and prepared a proposed alignment route map along with the village boundary map.
Collected 3 to 5 Nos of Ground Control Points (GCPs) with dual frequency DGPS in RTK Mode at each site in villages, Including painting of monument and 3 photos for each GCP.
Field survey along the bank of Najafgarh Drain 10 meters corridor on either side of 55 km line. Captured all sub-drain locations with geo coordinates. Collected cross-sectional details and invert levels of all the drains. Carried out a  topographical Survey along the main drains inclusive of the corridor of 10 meters on both sides of the drain.
Performed DT Leveling survey using Digital levels for providing height control in MSL datum over the project area a total of 2430 km covered in our survey
Fixed of pair of GCPs at every 5km with DGPS and Transferred the GTS Benchmark with Digital Level. Traversed survey area with Total Station. Collected Longitudinal levels along the alignment every 20 meters interval with cross-section at every 20 meters with Total Station. Collected all existing structures along the pipeline alignment such as government schools, religious structures, ponds, electrical poles, etc. Collected existing OHSR, GLSR, Sumps and cisterns. A total of 500km was covered in the survey.
A Topographical survey including grid survey @ 30m interval of ayacut area duly collecting all topographical Features and Generation 0.5m Contour
DT Leveling with digital level, BM Transfer along High-speed Rail (HSR) Corridor connects @200mts Intervals. a total of 420km surveyed
DT Leveling and BM Pillar fixing along NH-12 Jodhpur to Barr in Rajasthan for a length of 170 KMs
DT Leveling of Koyna surroundings to connect MSL to proposed NGRI GCP Points in Maharashtra. Total project length: 635 KMs
DT levelling, fixing of TBM along Roads and Canals, fixing of GCPs with DGPS, Topographical survey for Preparation of 0.5m contours.
Topographical Surveys 100000(1 Lakh) Ha/1000 Sq kms , BM Transfer. 1600 Kms GCPs 52 Pcps,400 Scps
DT Leveling survey using Digital levels for providing height control in MSL datum over the project area.
Project length: 850 Kms.
DT Leveling survey using Digital levels for providing height control in MSL datum over the project area.
Project length: 1066 KMs
Fixing of pair of GCPs at every 5km with DGPS. Fixing DTBMs at every 250 meters with Digital Level. Traversing with Total Station. Capturing the Topographical features with Terrestrial Laser Scanner along the alignment. Preparation of proposed alignment and marking on the ground.
Project area: 194 KMs
DT Leveling survey using Digital levels for providing height control in MSL datum over the project area of 1000 KMs
DT Leveling survey using Digital levels for providing height control in MSL datum over the project area of 275 KMs